Midwest Products 04188 "Long Lead" Zinc Lag Shields 1/2"
Description
"MIDWEST" LONG LEAD LAG SHIELDS
- Zinc.
- Requires 3/4" bit.
- Takes 1/2" screw.
- Use in mortar & concrete.
- Long.
- Boxed of 25.
- 1/2 L Size.
"MIDWEST" LONG LEAD LAG SHIELDS