Midwest Products 04187 "Long Lead" Zinc Lag Shields 3/8"
Description
"MIDWEST" LONG LEAD LAG SHIELDS
- Zinc.
- Requires 3/4" bit.
- Takes 1/2" screw.
- Use in mortar & concrete.
- Long.
- Boxed of 50.
- 3/8 L Size.
"MIDWEST" LONG LEAD LAG SHIELDS